From the workshop · 2026
Photos from the work.
Three projects from the bench this season — Systems Integration, Structural / Porch, and Antique Sales — flip through each spread from the most settled frames toward the first day on site, or click any photo to fill the screen.
Systems Integration
Three frames from an electrical-panel scope on a remodel — from the first day the cover came off, through mid-work on the wiring, to a wrapped install resting before the next trade arrives.
Structural / Porch
Four frames from a porch remediation — composite deck, the enclosed-flooring close, the trim and column pass, and the painter’s-tape prep before the first paint.
Antique Sales & Appraisals
A standalone frame from the antique sales lane — a piece is on the workshop bench before it goes to the floor.